DIY - Raised Beds

A project on Mom's to-do list for a while has been some raised beds for her to expand her new found gardening habit. I like to build things and since Mom has to put up with housing my business, she gets what she wants. I also realized I might be able to offer them to some of my clients and this would be a good test run. With the winter being slow and Matt & Dad available to help, this time of year was the perfect opportunity.

Before we could install the beds we had to cut down a couple maple trees in their backyard. This also had been on the to-do list because they were getting quite large and competing with the turf a little too much. So we got the two trees down and chipped up right before it started pouring rain.

We then got started on the bed frames. We had to work in the garage since it was still raining. It took the rest of the day to build the first one. We did the second one in half the the time the following day since we knew what we were doing. Cook also stopped by and offered a hand. 

The raised beds are constructed out of landscape timbers with the final dimensions of the beds being 8' x 4' x 1'. They are held together with 1/2" rebar. A closed loop of 1/2" drip irrigation lines the inside of the bed with eight 1/4" lines extending from the main line to the middle of the bed with 2 GPH emitters at the end of each line. 

I was very pleased with how they turned out. We may add some more if she gets a large vegetable operation going.
Matt and Dad cutting up the tree. Dad is a little more safety conscious than us.


Chipping up the limbs.


Makeshift work station.


The first layer.



Getting it square.
Future home of the beds. The white in the background is the wood chips for the fresh cut maples.

Drilling the holes for the rebar.


Hammering down the rebar for stability.





Putting on the drip irrigation's main line that goes around the top of the bed and will attach to the hose.

Moving the beds into place.


Leveling up the beds. We put each one over the new stumps so they'll now be hidden.

Adding in the drip lines with emitters. Each emitter is rated for 2 GPH.


Installed.


Monday, December 5, 2011

DIY - Urban Garden Box

Rebecca often laments at her lack of a green thumb. She also accuses me of withholding my plant skills whenever another one of her poor species bites the dust. Maybe I'm not as forthright with tips as I should be, but its not on purpose. I guess its the same reason we don't have very many pictures of ourselves around the house.

So, as a way to redeem myself, I decided to build Rebecca an Urban Garden Box. Since we live in a condo, we have zero yard space and its hard for me to get fired up about stuff in pots. This planter would give her more room to experiment and conveniently located on our balcony. I also have had a desire to build something lately, so this gave me an excuse to use my tools. It also coincided with the weekend David and Emily were in town to visit with us for the weekend. So we deemed Saturday, "Project/Craft Day." David decided to make some cubbie hole shelves for the Lucy's soon to be room. Emily introduced Rebecca to Pinterest so they now have endless ideas for stuff.

David and I went to Lowes to get our supplies. The mitre saw was the only tool we had to borrow from my Dad. The weather was beautiful, so it was hard to beat getting to have a relaxed Saturday working on something you really enjoy. Both projects took us all day. We had to pause during the late afternoon for some Christmas photos at the request of our wives. I set up a TV in the garage so we were able to stay updated on football. I was super pleased with how both projects turned out with our limited carpentry knowledge. I think the shelves will look great in the nursery room. Hopefully the garden box will be just the right vessel to tap into Rebecca's master gardener desire.

Our work area.

The plywood base for my garden box.

The sides before they got cut.

The side boards after getting cut.

The sides put together.

A look at the underside of the box.


Adding drainage holes to the plywood.

The landscape fabric added to the bottom.

Adding some drip irrigation.



Finished product. The main line runs around the top with feeder lines ready to run to the middle.

All done.

Plans for David's project.

Calibrating the saw.


Ready to put the puzzle together.


 


The finishing touches.

All done.

Wednesday, January 19, 2011

Condo Makeover

When we bought our condo back in October, we knew some updates would be in store in the near future. Before Christmas we decided to set aside MLK weekend as Condo Work Weekend. Rebecca's parents came for the weekend, my parents helped, and Matt and Loren came for Saturday. We came up with quite the list of projects to tackle this past weekend. Our work crew did a great job and the only thing we didn't get much of was sleep.

Friday Rebecca and I went to Lowes and Home Depot to purchase all the supplies and products. The plan was to let the Ladies do all the painting and the guys to do everything else on the list. Our place was a rental the prior 25 years, so everything was done for cost and efficiency. All the walls were the same color so Rebecca picked new colors for each room and bathroom.

Her parents arrived on Saturday and we got going. We worked til about 2 in the morning. Sunday we went to church and then got back at it. The most memorable thing happened late Sunday night and well into Monday morning. One of the projects on our list was to replace the shower valve and shower head in our bathroom. It was leaking and the original handles, so we wanted to update it. Dad and I opened it up to look at it and decided "we didn't have the tools to pull this off" during the work weekend amidst all the other projects. So we decided to just change the shower head, which is simple. Changing the handle involved changing the valve, which meant we would have to cut the copper pipes and solder the new valve on. Another big issue with plumbing projects involved cutting off the water. To our knowledge and our neighbors there is no water cut-off for individual units or even buildings (which have 4 units a piece). The only known water valve is at the street which cuts off the water to about 32 units. So making that many people inconvenienced is not a good way to make friends with our new neighbors.

Late Sunday night we decided to attempt to fix the leaks in both our showers. You still have to turn the water off, but you don't have to cut the pipes to replace the valves. So we decided to wait until late that night to turn the water off hoping everyone was asleep. At about 12:30 I took my vice grips to the street and turned the water off. We worked on the guest shower first. It took us about 30 minutes, but we replaced the leaky gaskets and put it back together. I turned the water back on and no leaks. We then debated about doing our shower. We decided it was now or never so I went back outside and turned the water off again. Rebecca's dad began to turn the cap to access the valve. It was not breaking loose so he turned harder. I don't think he realizes his own strength sometimes. When it finally did begin to turn, he wasn't sure if it was just the cap or all the pipes behind it. If it was the pipes it was too late and you had to keep going to find out. The cap finally broke loose and our worst fears were realized. The pipes behind the valve looked like a twizzler. So it was now about 1:45 AM, we had leaky shower valves, and 32 apartments did not have water. If we turned the water back on, the pipes would leak into our walls causing lots of damage. My heart sank about the situation. The day had gone so well and now we were in quite a bind because now so many people did not have water. I went ahead and cut the sheet rock out behind the shower valve to see it from the other side since that would have to be done eventually to fix it. We attempted to rig some way of catching the water and diverting it to the shower drain, but there was no way I could sleep with that going on. We decided to call the 24 hour plumbing hot line. My biggest fear was that there would be a huge fee for after hours call on a holiday weekend. The number diverts you to a national call center which in turn gets a local guy to call you back about your problem. TJ from Evans Services called me back 2:30AM. I told him our situation and asked how much this would cost. He said an after hours service call is $90 if they don't do any work. If we get them to fix something they wave the fee and just charge for the fix. That wasn't nearly as bad as I expected, so I told him to come on. He said it would be an hour before he got there and it would take an hour and half to fix.  So that put us at being done at 5 AM, just in time for people to be waking up and needing water. At this point Rebecca and Mr. Chip went to sleep, leaving me to wait on TJ to arrive. I sat by the window watching for the van to pull up. TJ showed up and got to work. Because I was so tired the whole event seemed surreal. I took a picture of him working to document that it really happened. I took him up to our bathroom and showed him the damage. I then asked him about the damage to my wallet. He said normally a valve change cost $500. I thought great, this is definitely not a normal situation. But then he said, how about $300. I was shocked. This was much cheaper than what I was expecting, so I told him to get started. I'm not sure why he knocked off $200. Maybe because we already had the parts and I had already cut the hole in the wall. Or maybe he was just being nice. He definitely had the upper hand so I'm so thankful it was less than expected. I always enjoy watching somebody work who is good at what he does. TJ was definitely skilled and did the whole operation without making any mistakes. It took him an hour and half like he said. By 5 AM we had a leak free shower with the new valve, handle and shower head that we originally wanted and the neighborhood had their water back on. To celebrate I took a shower. I only got about 2.5 hours of sleep before it was time to work again. Surprisingly I was not that tired. The Lord took care of us and in the end the whole situation worked out very well.

We didn't get everything done, but I'm very happy with the things we did get done. Here are some pictures of the updates.

Before we started working.
Entire Downstairs.
Covering up the new furniture.
Old Chandelier
New Chandelier

1/2 Bath Before

Notice wallpaper and floors
The beginning of the new wood floors
Mr. Chip working in his corner
New wood floors

Our toilet on the front porch



Updated 1/2 bath with new floors, new paint, and new vanity



Old fan in our room
Old fan moved to the guest room
New fan in our room that has a remote
Dad reinforcing our counter

Mrs. Melanie painting
Dad's new scaffolding in our stairwell 

Mrs. Melanie on the 12 foot ladder on top of the scaffolding

Me holding the ladder

Rebecca asking for our scared faces, since in her mind we were all about to die on this rig to paint the stairwell

Dad's scared face

Old and new colors in living room.

Rebecca painting on the 6 foot ladder in the stairwell




The cause of my sleepless night


The leaky valve now the broken valve

Notice the twisting of the copper. Those are suppose to be straight.


Cutting the hole in the wall

The attempted basin to catch the leaky valve during the night

Examining the problem

Not going to cut it

Our nice hole

Rebecca posing at 2:30 AM




TJ hard at work with his torch

The note I had left at the street telling anyone who tried to turn the water back on to call me first. Its now going to be patched in the wall.

New shower!